Irrigation Pumping Station – Royal Commission Yanbu

  • Home
  • Irrigation Pumping Station – Royal Commission Yanbu

Irrigation Pumping Station – Royal Commission Yanbu

Description
    • Design of the Irrigation Pump Station
    • The scope of this project is to Construct Irrigation Pump Station in the Green Buffer Zone Area of Yanbu Industrial City Community -2 which will fulfil the irrigation water demand of Phase 1, 2, 3, 4, 5, 6, & 7 for the development of Community 2 in accordance with the Yanbu 2030 Industrial City Master Plan.
    • Surge Analysis

Performed transient analysis for the sewer system using Bentley Hammer software. Hydraulic transient analysis is performed using the above software to simulate the surge condition for different scenarios:

  • 1. Sudden Pump Start
  •  2. Sudden Pump Trip or Pump power failure
  • 3. Sudden Valve closure when pump in normal operation
  • 4. Different positions of valves.