Sulphate Removal, Aindar, Aramco Project

  • Home
  • Sulphate Removal, Aindar, Aramco Project

Sulphate Removal, Aindar, Aramco Project

Description
  • We performed the role of Design consultant to the contractor for HVAC detailed design and shop drawings.
Scope
    • Site survey and study of the 110/208 voltage power supply system
    • Replacing the existing transformer with a suitable standard secondary voltage
    • Replacing the Downstream power panels, Lighting system, power outlets, etc., in compliance with the Standard Voltage system
    • Replacing all the obsolete voltage equipment with the equivalent standard voltage equipment.